To interact with PPs and get project details.
· To ensure that the project details are complete.
· To fill up Form-1 and prepare TOR for projects needing EIA and submit to EAC/SEAC based on project details.
· To defend TOR and obtain TOR approval.
· To organize base line data generation as per TOR through laboratory.
· To fill up Form1/1A and prepare Conceptual Plans (CP) for projects not needing EIA and to submit to statutory bodies.
· To present above to EAC/SEAC/SEIAA to get Environmental Clearance (EC).
· To write and submit draft EIA reports and Executive Summary translated in local language to statutory bodies for projects needing public hearing.
· To organize and attend Public Hearing.
· To compile Public Hearing proceedings and prepare Final EIA report.
· To defend Final EIA report at EAC/SEAC and obtain clearance.
· To assist client in obtaining Consent to Establish CTE/CTO from concerned SPCB.
Job Type: Full-time
Salary: ₹780,000.00 - ₹1,020,000.00 per year
Schedule:
- Day shift
Education:
- Bachelor's (Preferred)
Experience:
- Form1/1A /EAC/SEAC /CTE/CTO: 5 years (Preferred)
- Solid Waste/Water pollution: 3 years (Preferred)
- Environmental Impact Assessment: 5 years (Preferred)
Speak with the employer
+91 7715081139